We design and install hot-water underfloor heating for villas and standalone houses in 6th of October City. We visit your site, measure the areas, and give you a circuit design and a detailed written quotation.
In 6th of October City we deal with villas and standalone houses of varying sizes, and the site visit establishes the existing insulation and the floor build-up available for the network.
How we work with you in 6th of October City
- Site visit: we come to your property, measure the areas and check the finishing stage.
- Heat load calculation: we calculate each room’s requirement instead of estimating by floor area alone.
- Circuit design: we split the network across manifolds and define boiler and thermostat locations.
- Written quotation: stating what the price includes and excludes, with an agreed schedule.
- Installation: insulation, pipes and manifolds using Giacomini products.
- Pressure test and handover: we pressure-test the network before the screed is poured and hand it over with a report.
Best time to install
Underfloor heating should be decided before plastering and flooring, because the network is installed beneath the finishes. If your villa is still at the structural stage, send us the area and stage and we will arrange a visit. After finishing, the options are limited and are decided after the site visit.
What does the EGP 1,500 per m² price include?
The price includes:
- Pipes (Giacomini)
- Manifolds (Giacomini)
- Insulation
- Installation
The price does not include:
- The boiler (heat source)
- Thermostats and control systems
- Finishing and tiling works
Why Master Line?
All underfloor heating components are Italian Giacomini products, with a single point of responsibility from site visit to handover. We provide a 20-year warranty on the network. Details on the product warranty page.
Underfloor heating in 6th of October City: frequently asked questions
How much per square metre?
EGP 1,500 per square metre with Giacomini products, covering pipes, manifolds, insulation and installation. The final price follows the site visit and design.
Does the price include the boiler?
No. The boiler is quoted separately according to the villa’s requirement.
Are finishing and tiling part of your work?
No, they are outside our scope. We coordinate timing with the finishing contractor.
When should I start?
Ideally before plastering and flooring. Send us the area and finishing stage and we will set a visit date.
For full details read our underfloor heating page or underfloor heating price per m² in Egypt.
